Texas Water Development Board Grant Awards – Flood Infrastructure Fund: Drainage Improvement Projects – Fairview (Location 1)
The Texas Water Development Board (TWDB) has awarded $1,399,500 in grant and loan funding for essential drainage improvements in the Fairview Heights Subdivision and San Jose Estates.
Project Overview
The proposed drainage improvements will address flooding issues along Fairview Drive, Brookshire Drive, and nearby streets. These upgrades will significantly improve stormwater management in the area.
Key Improvements:
- Offsite channel upgrades
- Installation of a new storm sewer drainage system
- Addition of 16 curb inlets
- 2,400 linear feet of stormwater-conveying system
Current Issues:
- Flooding along Fairview Drive
- Vehicles stalled during heavy rain
- Insufficient inlets and storm sewer capacity
- Roadway runoff exceeding capacity
Community Benefits:
These improvements will mitigate frequent flooding and provide a more resilient stormwater infrastructure, benefiting the densely populated residential areas.